Name of the Organization : Gujranwala Electric Power Company
Type of Facility : Online Electricity Bill View
Location : Gujranwala
Country : Pakistan
Website : gepco [dot] com [dot] pk
GEPCO Online Electricity Bill View
Printing Instructions :
** In Internet Explorer from the FILE menu click “PAGE SETUP”
** Select PAPER SIZE as “A4″Please Enter Your 14 digit Numeric Reference Number (no space) to view bill online
Related : GEPCO New Connection Application Gujranwala : www.statusin.org/2523.html
** Delete the values under HEADER and FOOTER
** Select ORIENTATION as “Portrait”
** Provide values of all four MARGINS as “0.25”
** Click the OK button
** From the FILE menu click “PRINT”
** Choose appropriate printer and click the PRINT button
View Bill : http://210.56.23.106:888/gepcobill/
For Billing Complaints :
** Contact the nearest Customer Service Centre (CSC) serving in your area.
** Goto to XEN/SDO/RO Office of your area. For Extension in Due-Date.
** Call the nearest Customer Service Centre (CSC) of your area. > Contact XEN/SDO/RO Office of your area.
FAQs :
What is GEPCO doing to control excessive supply failures due to kite flying with metallic wire?
The problem is being tackled on the technical level by covering the Grid Stations equipment with guard wires and nets.
At the administrative and legal level, patrole teams are organized to nab the culprits using the metallic wires and handing them over to the Police for registering cases against them.
However, public support is very necessary to curb this practice. GEPCO solicits public support by organizing walks, seminars and appeals through print/electronic media.
How the dangerous poles or wires hindering the doorway or the street can be removed?
As the poles/wires were installed before the construction of the house or street, give the details in writing to the Executive Engineer Operation of your area, who will prepare an estimate of the probable cost of removing the pole or wires. This cost has to be paid by you for relocation of the pole or wires.
What is the policy and procedure for the electrification of a left over locality or a Village?
The electrification of villages/localities if financed and approved by local or provincial government. Please get in touch with your elected representative for the electrification of your locality or village.
GEPCO will provide a feasibility report. On payment of the full cost, the required electrification will be undertaken. The cost of electrification of housing schemes is similarly borne by the sponsors or residents.
Why does my new meter run faster than the old meter which has been replaced by GEPCO?
It is not true. The fact is that the new meter runs correctly. It was the old meter which had become slow and sluggish due to age and/or other external/internal causes.
Whom to approach for correction of wrong reading on the bill?
Please contact SDO/XEN & Customer Services Centre of your area or GEPCO Head Quarter.