Name of the Organization : Gujranwala Electric Power Company
Type of Facility : Income Tax & GST View
Location : Gujranwala
Country : Pakistan
Website : gepco [dot] com [dot] pk
GEPCO Income Tax & GST View
Please Enter Your 14 digit Numeric Reference Number (no spaces)
Related : GEPCO New Connection Application Gujranwala : https://www.statusin.org/2523.html
Printing Instructions
** In Internet Explorer from the FILE menu click “PAGE SETUP”
** Select PAPER SIZE as “A4”
** Delete the values under HEADER and FOOTER
** Select ORIENTATION as “Portrait”
** Provide values of all four MARGINS as “0.25”
** Click the OK button
** From the FILE menu click “PRINT”
** Choose appropriate printer and click the PRINT button
FAQs
What does GEPCO stand for?
Gujranwala Electric Power Company.
How can the connection be converted into other persons name?
The change in name of the connection can be arranged by applying for the same to the concerned Sub-Division on the prescribed application form to be submitted duly filled in along with the required document to substantiate justification for change of name.
After the applicant has fulfilled all the per-requisites for change of name the connection is changed into the desired new name.
What does WAPDA stands for?
Water and Power Development Authority
How can a wrong bill be corrected?
In case any bill contains any error the consumer should report to the concerned Customer Service Centre/Sub-Division/Revenue Office.
Where can a consumer deposit the electricity bills?
WAPDA has made arrangement with all scheduled Banks of Pakistan and the post offices, who have specified their branches in all parts of the country to facilitate the consumers for making payment of their bills.
The consumer can deposit his bill in any authorized Bank branch/Post Office within District/ City.
How can a consumer get his load increased/decreased according to his requirement?
The consumer will have to apply to the SDO/other competent authority who will arrange the verification of the load and test report and will arrange the reduction/extension of the load.
How can a consumer arrange the disconnection of his supply and refund of security?
The consumer who does not want to continue his electricity connection will apply for permanent disconnection to the SDO. The connection would be temporarily disconnected by the SDO after obtaining clearance from Revenue Office .
How the dangerous poles or wires hindering the doorway or the street can be removed?
As the poles/wires were installed before the construction of the house or street, give the details in writing to the Executive Engineer Operation of your area, who will prepare an estimate of the probable cost of removing the pole or wires. This cost has to be paid by you for relocation of the pole or wires.
What is the policy and procedure for the electrification of a left over locality or a Village?
The electrification of villages/localities if financed and approved by local or provincial government. Please get in touch with your elected representative for the electrification of your locality or village.
GEPCO will provide a feasibility report. On payment of the full cost, the required electrification will be undertaken. The cost of electrification of housing schemes is similarly borne by the sponsors or residents.
View Comments (1)
I want to see detail of income tax payed for this 2013-14