kmcebps.gov.np e-BPS Electronic Building Permit System Nepal : Kathmandu City Office

Organization : Kathmandu City Office
Type of Facility : e-BPS Electronic Building Permit System
Country: Nepal

Sponsored Links:
Want to comment on this post?
Go to bottom of this page.

Website : ebps [dot] kathmandu [dot] gov [dot] np

e-BPS Electronic Building Permit System

Electronic Building System (e-BPS) is a software tool to process municipal building permit application and issue building bylaws and building code compliant building permit certificate.

Sponsored Links:

Related : Inland Revenue Department Nepal e-TDS Electronic Tax Deduction at Source System : www.statusin.org/7492.html

e-BPS is aimed at supporting municipalities for an improved building permit process involving automated verification and checking of proposed building to comply with defined.

Building Permit Process :
Request and obtain temporary building permit:
The 35 days are divided as follows:
Day 1: Build Company submits the drawings to the municipality along with a copy of the title certificate.
Day 2: The municipality forwards the file to the municipality ward office where the land is located.
Day 4: The ward office checks the field and sends a notice to the site’s neighbours.
Day 8: Start of the maturation of notice period.
Day 23: Start of the local inquiry done by the ward office.
Day 27: The ward office sends the file back to the municipality.
Day 29: The municipality starts the process of issuing a temporary approval of the drawings. At least one of the neighbours must give their consent in order for the project to be approved. Otherwise, the builder can submit a “commitment letter” certifying that he is responsible for any potential disputes in the future. This step can delay the approval process to around 2 months.

An applicant must submit the following documents along with the building permit application:
** Identity document of the owner (or Company Registration Certificate)
** Certification by a registered architect or engineer
** Cadastral extract
** Proof of land ownership/lease
** Building Plans
** Lot plan
** Proof of tax payment
** Structural plans (not required for buildings with ground coverage area of less than 1,000 sq. ft. and less than 3 stories)

The originals of all documents must be demonstrated when submitting the copies to the Urban Development Department of Lalitpur Metropolitan City.

The building permit fee is calculated as follows :
** Built-up area up to 3,000 sq. ft.: NPR 10.00 per sq. ft.
** Built-up area between 3,001 and 5,000 sq. ft. : NPR 15.00 per sq. ft.
** Built-up area 5,001 sq. ft. and above: NPR 20.00 per sq. ft.

For apartment housing and group housing, the application fee is a flat NPR 25.00 per sq. ft.

In addition to the building permit fee, the Urban Development Department also charges a Designer Fee of NPR 2,000.00. The project designer must be licensed by the Department. The license is called Certificate of Designer and is renewed every year at the Municipality. The annual fee is NPR 3,000.00. The Municipality charges an additional NPR 2,000.00 for each building design.

Contact Address:
KMC E-BPS Project
Kathmandu City Office
Bagh Durbar, P.O.Box: 8416
Kathmandu, Nepal